The crew from Contract Exteriors begins to install the Metal Roof.
A photo of the painted house and metal roof.
A view from the street with the living room windows open.
The hardwood floor installation process begins. Because this was my first attempt at installing flooring, I laid the pattern out without nails as a dry run to test dimensions and other details.
A photo of the floor without nails, but the layout is coming into focus.
The first photo after the floors have been nailed down.
A view looking into the bedroom from the living room. I wanted a continuous floor throughout the apartment.
A view across the threshold between living room and bedroom.